I-35W work may stall Wakota Bridge

| No Comments | No TrackBacks
Seriously, our state is starting to show it's own signs of incompetence.

Star Tribune

18-1final.doublewide.prod_affiliate.2.jpg

The long-troubled east metro project might lose another construction season, officials say.

Last update: September 24, 2007 - 11:01 PM

Plagued by a history of delays, design flaws and cost overruns, the Wakota Bridge has now been placed on a possible hit list of projects that may be temporarily shelved to free up funds for reconstruction of the collapsed Interstate 35W bridge.

The opening of the east-bound Wakota Bridge, which spans the Mississippi River between South St. Paul and Newport, already had been delayed until 2009 while the project was being rebid.

Washington County Commissioner Myra Peterson, who represents the district around the bridge, said the result of further delay might be the loss "of a whole construction season."

No TrackBacks

TrackBack URL: http://www.rooksrant.com/cgi-bin/mt/mt-tb.cgi/117

Leave a comment

The Liberal Coalition

Minnesota Lefties

The Big Roll

Powered by Movable Type 4.21-en
Creative Commons License
This blog is licensed under a Creative Commons License.

Begging

My Amazon.com Wish List

About this Entry

This page contains a single entry by Rook published on September 25, 2007 7:16 AM.

All Saints 1, IRS 0 - The Carpetbagger Report was the previous entry in this blog.

Norm’s Not Looking So Good is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Minnesota Blogs

Categories